You don't have javascript enabled. Good luck with that.
Pencarian
palang erp erna

ERP to Be Tested on July 15

The installation of Electronic Road Pricing (ERP) gate in front of Panin Bank, Jalan Sudirman, Central Jakarta, has been done last night, Thursday (7/3). It is scheduled that the gate made by a Swedish company, Kapsch, to be used on Tuesday (7/15).

ERP gates installation will be done for a week. And on July 15, ERP will be tested

“ERP gates installation will be done for a week. And on July 15, ERP will be tested. The gate which has been installed is the one on the west side heading Semanggi. As for the gate on the east side, it will be installed today,” stated Head of Jakarta Transportation Department, M Akbar, Friday (7/4).

According to Akbar, in the ERP gate, there are three machines installed to detect On Board Unit (OBU) installed in vehicles. Those machines are VDC Passage (censor to detect type of vehicle), VR censor (camera to take plat number pictures of vehicles violating the rule), and Transceivers (data receiver from OBU).

ERP Gate Installed, Part of Jalan Sudirman Closed

Later, the vehicles which have installed OBU will have their balance cut whenever passing ERP area. As for vehicles which have not installed OBU, they will be directly detected and got their police plat numbers recorded to be ticketed afterwards.

In trial period, 50 vehicles will be installed with OBU to know whether the machines installed in ERP gates could detect the device. The trial itself will be conducted for three to six months.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye819 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye657 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye590 personAldi Geri Lumban Tobing
  4. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye519 personDessy Suciati
  5. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye512 personAnita Karyati