You don't have javascript enabled. Good luck with that.
Pencarian
 Pengerjaan Pemasangan Sheetpile Kali BGR Capai 45 Persen

December, Sheetpile Installation in KBR River Completed

The sheetpile installation process on the BGR River, Kelapa Gading Barat Urban Village, Kelapa Gading, North Jakarta has reached 45 percent.

The work includes two sides of the river and has reached 45 percent. Each east and west side covers 950 meters

Andika Purnomo, Section Head of Development and Improvement for East Flow River and Coast Systems stated that sheetpile is developed up to 1,900 meters length. It has been carried out since July 2018.

Sheetpile Slide in Bidara Cina Pump House

"The work includes two sides of the river and has reached 45 percent. Each east and west side covers 950 meters," he expressed, Monday (10/29).

It is an effort to overcome inundation that often occurs on Jalan Boulevard Barat during rainy season. In the future, at the end of the river, there will be a pump house to flow water to Sunter River.

"Yet its pump procurement is not this year. Temporarily we will make a bend first. Our target the work can be complete by the end of this year," he hoped.

Linked News
Popular News indeks
  1. Car Free Night Held on Eid Eve, Be There!

    access_time19-03-2026 remove_red_eye712 personDessy Suciati
  2. Jakarta Leaders Join Residents for Eid al-Fitr Prayer at City Hall

    access_time21-03-2026 remove_red_eye662 personFolmer
  3. Homecoming Travelers Surge Seen at Tanjung Priok Terminal

    access_time17-03-2026 remove_red_eye637 personAnita Karyati
  4. Special Eid Services: Transjakarta Adjusts Operational Patterns

    access_time18-03-2026 remove_red_eye542 personAldi Geri Lumban Tobing
  5. Health Agency Urges Public to Be Alert for Extreme Hot Weather

    access_time19-03-2026 remove_red_eye493 personAldi Geri Lumban Tobing