You don't have javascript enabled. Good luck with that.
Pencarian
Desember, Pemasangan Sheet Pile Kali Angke Selesai-

Sheet Pile Installation in Angke River to Finish December

The sheet pile installation in Angke River, Pesing Poglar, Kedaung Urban Village, Cengkareng, West Jakarta keeps accelerating. The target is to finish in upcoming December.

We seem to have problem at the bottom due to many rocks

Baru River's Sheet Pile in Pasar Minggu Collapsed

“We seem to have problem at the bottom due to many rocks. It is targeted to finish before new year,” said Joko Tri Widodo, Field Coordinator of sheet pile installation, Wednesday (11/25).

A 15 meters-sheet pile by 10 tons weight will be installed with 100 meters distance. It merely 65 sheet piles installed from the total of 250 sheet piles.

Linked News
Popular News indeks
  1. Kampung Melayu Sports Facility Inaugurated to Tackle Brawls

    access_time06-11-2026 remove_red_eye440 personDessy Suciati
  2. Commission D Calls for Integrated Air Quality Monitoring System

    access_time06-11-2026 remove_red_eye422 personFakhrizal Fakhri
  3. Aid for Fire Survivors at Pinus Elok Flats Has Been Distributed

    access_time06-11-2026 remove_red_eye416 personNurito
  4. House Fire in Sunter Agung Successfully Extinguished

    access_time04-11-2026 remove_red_eye406 personAnita Karyati
  5. Faith Meets Progress, Ancol Prayer Gathering Fortifies Jakarta’s Journey as a Global City

    access_time01-11-2026 remove_red_eye406 personAnita Karyati