You don't have javascript enabled. Good luck with that.
Pencarian
Desember, Pemasangan Sheet Pile Kali Angke Selesai-

Sheet Pile Installation in Angke River to Finish December

The sheet pile installation in Angke River, Pesing Poglar, Kedaung Urban Village, Cengkareng, West Jakarta keeps accelerating. The target is to finish in upcoming December.

We seem to have problem at the bottom due to many rocks

Baru River's Sheet Pile in Pasar Minggu Collapsed

“We seem to have problem at the bottom due to many rocks. It is targeted to finish before new year,” said Joko Tri Widodo, Field Coordinator of sheet pile installation, Wednesday (11/25).

A 15 meters-sheet pile by 10 tons weight will be installed with 100 meters distance. It merely 65 sheet piles installed from the total of 250 sheet piles.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1479 personFolmer
  2. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1293 personAldi Geri Lumban Tobing
  3. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1198 personAldi Geri Lumban Tobing
  4. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye1027 personFolmer
  5. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye948 personDessy Suciati