You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan CCTV di Johar Baru Rampung

CCTV Repair in Johar Baru Completed

The repair of closed circuit television (CCTV) camera in Johar Baru had been completed by Central Jakarta Administration.

The connection is back a fter been troubled two weeks ago

Basuki: JPO Should Be Built Bright and Spacious

“The connection is back after  been troubled two weeks ago,” said Arifin, Vice Mayor of Central Jakarta, Monday (11/30).

In addition, the CCTV installation in Johar Baru was extremely required as concerning it eases coordination during brawl.

“Residents and police requesting some CCTV spots. It is expected to give deterrent effect against brawl actor,” he stated.

Relaying on Beritajakarta.com's observation, the monitor screen put in Johar Baru Sub District Office has been connected with CCTV installed.

 

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1303 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1096 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati