You don't have javascript enabled. Good luck with that.
Pencarian
DKI Kaji Penutupan Perlintasan KA Tubagus Angke

City Reviewed Closing of Tubagus Angke Railway Crossing

Jakarta Provincial Government was reviewing closing of railway crossing at Jalan Tubagus Angke, Tambora, West Jakarta. Besides considering the security factor,  the road already now has flyover so that the traffic would not be disrupted.

We're going to review the closing of railway crossing at Tubagus Angke

Previously, last Sunday morning (12/6), Metromini B80 route Jembatan Lima-Kalideres was hit by Commuter Line train and causing teens of passengers died. The Metromini B 7760 FD was hit after breaking through the railway crossing .

"We're going to review the closing of railway crossing at Tubagus Angke. Even it's closed there had been flyover ," said Head of Jakarta Transportation Department, Andri Yansyah, Monday (12/7).

PT KAI Please Build Overpass Railway, Basuki Says

According to him, the accident was the impact of the unclosed railway. Because, by such condition, it is possible to allow people breaking through the crossing.

"Logically, there is still crossing which people can break through it. Like the incident yesterday that was really ridiculous," he expressed.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye949 personAldi Geri Lumban Tobing
  2. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye607 personDessy Suciati
  3. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye582 personAldi Geri Lumban Tobing
  4. Transportation Agency Prepares Traffic Management Plan for Indonesia's 81st Anniversary Celebrations

    access_time15-08-2026 remove_red_eye561 personAldi Geri Lumban Tobing
  5. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye535 personDessy Suciati