You don't have javascript enabled. Good luck with that.
Pencarian
DKI Kaji Penutupan Perlintasan KA Tubagus Angke

City Reviewed Closing of Tubagus Angke Railway Crossing

Jakarta Provincial Government was reviewing closing of railway crossing at Jalan Tubagus Angke, Tambora, West Jakarta. Besides considering the security factor,  the road already now has flyover so that the traffic would not be disrupted.

We're going to review the closing of railway crossing at Tubagus Angke

Previously, last Sunday morning (12/6), Metromini B80 route Jembatan Lima-Kalideres was hit by Commuter Line train and causing teens of passengers died. The Metromini B 7760 FD was hit after breaking through the railway crossing .

"We're going to review the closing of railway crossing at Tubagus Angke. Even it's closed there had been flyover ," said Head of Jakarta Transportation Department, Andri Yansyah, Monday (12/7).

PT KAI Please Build Overpass Railway, Basuki Says

According to him, the accident was the impact of the unclosed railway. Because, by such condition, it is possible to allow people breaking through the crossing.

"Logically, there is still crossing which people can break through it. Like the incident yesterday that was really ridiculous," he expressed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye396 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close