You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air Jl Raya Pejagalan Dinormalisasi

Channel on Jalan Raya Pejagalan Normalized

Normalization is carried out to follow up public complaint

Channel on Jalan Marunda Baru III Dredged

Water channel along Jalan Raya Pejagalan, Pekojan, Tambora, West Jakarta is still being normalized. It is targeted to be complete in a week.

West Jakarta Water Management Sub-dept Head, Imron said, from overall length 470 meters, around 200 of them are covered by sheet pile (inrit). Hence, before dredging, it will be demolished first.

"Normalization is carried out to follow up public complaint. After inrit, we will dredge the whole channel," he expressed, Monday (2/22).

He added, after that, the channel along the road must not be closed. But it should be coordinated with urban village side first and be equipped with a control tub.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye648 personTiyo Surya Sakti
  3. Pramono: Jakarta Government Acts Swiftly to Tackle Flooding

    access_time30-01-2026 remove_red_eye369 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye369 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye362 personDessy Suciati
close