You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air Jl Raya Pejagalan Dinormalisasi

Channel on Jalan Raya Pejagalan Normalized

Normalization is carried out to follow up public complaint

Channel on Jalan Marunda Baru III Dredged

Water channel along Jalan Raya Pejagalan, Pekojan, Tambora, West Jakarta is still being normalized. It is targeted to be complete in a week.

West Jakarta Water Management Sub-dept Head, Imron said, from overall length 470 meters, around 200 of them are covered by sheet pile (inrit). Hence, before dredging, it will be demolished first.

"Normalization is carried out to follow up public complaint. After inrit, we will dredge the whole channel," he expressed, Monday (2/22).

He added, after that, the channel along the road must not be closed. But it should be coordinated with urban village side first and be equipped with a control tub.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1616 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1457 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1321 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1093 personDessy Suciati
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye981 personDessy Suciati