You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Phb Palem Dipertanyakan

Palem Connecting Channel Dredging Project Neglected

Residents of Tugu Utara Urban Village, Koja, North Jakarta questioned about the continuation of Palem connecting channel dredging project. It is because the project was stopped since January and still no sign to be continued.

We hope related agency would continued the project since our area is prone to flood

RW 06 headman, Dodi, admitted his area is prone to flood during rainy season. Dredging project worked by local water management sub-department was only up to Taman Mangga from Jalan Mahoni. It is only 300 meter.

In fact, channel’s total length is one kilometer. 700 meter channel dredging project is neglected.

Connecting Channel on Jalan Kesehatan Dredged

“We hope related agency would continued the project since our area is prone to flood,” he said.

Nandang Hidayat, Tugu Utara Urban Village, said residents have requested to finish the dredging project. His side will coordinate with local water management sub-department to finish the remaining project.

“It is hoped the request can be responded well,” he said.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1090 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye575 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye499 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye477 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye474 personBudhi Firmansyah Surapati