You don't have javascript enabled. Good luck with that.
Pencarian
 Salahi Perizinan, Bangunan 3 Lantai Dibongkar

Violating IMB, Three-Story Buildings Demolished

Due to it is used as a warehouse, a three-story building standing on Jalan Jatinegara Timur IV, No. 8B, RT 09/02 Balimester, Jatinegara, East Jakarta, demolished. 

The owner uses the building as a warehouse with three floors. Our warning letter was ignored, so we control their building forcibly

According to Siska Primadini, Head of Jatinegara Sub-district's Arrangement Section, Siska Primadini said, prior to demolishment, the building owner had received warning letter on December 21 and sealing letter on December 23 until demolishment warrant on December 28.

"The owner uses the building as a warehouse with three floors. Our warning letter was ignored, so we control their building forcibly," he stated, Monday (3/14).

A Four-Story Building in Grogol Utara Demolished

He added there was another building that has a higher size, but it was not demolished. This is because, it is in accordance with permit and design that reported to the PTSP office in Jatinegara Sub-district.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye799 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye525 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye461 personAldi Geri Lumban Tobing
  4. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye401 personDessy Suciati
  5. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye371 personAnita Karyati