You don't have javascript enabled. Good luck with that.
Pencarian
Halte Bus Transjakarta Terintegrasi Dengan MRT Tunggu Pembangunan Rampung

Integrated Bus Stop-MRT Project Will Begin After Construction

Jakarta Transportation Dept is about to review the integrated Transjakarta bus stops with Mass Rapid Transit (MRT) after its construction has reached 80 percent.

Surely we will select which bus stops that will be integrated, as long as the project has touched 80-90 percent

"This is under construction process. Surely we will select which bus stops that will be integrated, as long as the project has touched 80-90 percent," he stated, Monday (4/11).

By doing so, it would smoothen its project process.

Protocol Road Repair will Be Done After MRT

"The easy thing is relocating the bus stops that we want," he uttered. 

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1343 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye1018 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye957 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye731 personAldi Geri Lumban Tobing
  5. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye715 personAldi Geri Lumban Tobing