You don't have javascript enabled. Good luck with that.
Pencarian
Halte Bus Transjakarta Terintegrasi Dengan MRT Tunggu Pembangunan Rampung

Integrated Bus Stop-MRT Project Will Begin After Construction

Jakarta Transportation Dept is about to review the integrated Transjakarta bus stops with Mass Rapid Transit (MRT) after its construction has reached 80 percent.

Surely we will select which bus stops that will be integrated, as long as the project has touched 80-90 percent

"This is under construction process. Surely we will select which bus stops that will be integrated, as long as the project has touched 80-90 percent," he stated, Monday (4/11).

By doing so, it would smoothen its project process.

Protocol Road Repair will Be Done After MRT

"The easy thing is relocating the bus stops that we want," he uttered. 

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye709 personTiyo Surya Sakti
  3. Pramono: Jakarta Government Acts Swiftly to Tackle Flooding

    access_time30-01-2026 remove_red_eye370 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye369 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye362 personDessy Suciati
close