You don't have javascript enabled. Good luck with that.
Pencarian
Halte Bus Transjakarta Terintegrasi Dengan MRT Tunggu Pembangunan Rampung
.
photo Ilustrasi - Beritajakarta.id

Integrated Bus Stop-MRT Project Will Begin After Construction

Jakarta Transportation Dept is about to review the integrated Transjakarta bus stops with Mass Rapid Transit (MRT) after its construction has reached 80 percent.

Surely we will select which bus stops that will be integrated, as long as the project has touched 80-90 percent

"This is under construction process. Surely we will select which bus stops that will be integrated, as long as the project has touched 80-90 percent," he stated, Monday (4/11).

By doing so, it would smoothen its project process.

Protocol Road Repair will Be Done After MRT

"The easy thing is relocating the bus stops that we want," he uttered. 

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye544 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye439 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye298 personAldi Geri Lumban Tobing
  5. Jakarta Commits to Realizing National Waste Management Pilot Project

    access_time17-02-2025 remove_red_eye294 personFolmer