You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Pasadena Diturap

Pasadena Connecting Channel Plastered

Pacuan Kuda Pulomas area, East Jakarta keeps being arranged towards Asean Games 2018. One of the efforts is dredging and installing plaster along Pasadena connecting channel.

Channel to be dredged and plastered is about 1.6 kilometer

Ahmad Yazied Bustomi, East Jakarta Head Sub-dept. of Water Management, admitted the project is implemented in front of Pacuan Kuda Pulomas.

“Channel to be dredged and plastered is about 1.6 kilometer,” he said, Wednesday (4/20).

30 PPSU Personnel Cleaned Pulomas Debris

According to him, plastering project is divided into two sides, west and east. Each side to be plastered is 800 meters with two meters of height above water surface and 50 cm into the channel bottom.

The project has been started since a month ago and it is targeted to complete this April.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1456 personFolmer
  2. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1231 personAldi Geri Lumban Tobing
  3. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1047 personAldi Geri Lumban Tobing
  4. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye993 personFolmer
  5. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye888 personAldi Geri Lumban Tobing