You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Pasadena Diturap
.
photo Nurito - Beritajakarta.id

Pasadena Connecting Channel Plastered

Pacuan Kuda Pulomas area, East Jakarta keeps being arranged towards Asean Games 2018. One of the efforts is dredging and installing plaster along Pasadena connecting channel.

Channel to be dredged and plastered is about 1.6 kilometer

Ahmad Yazied Bustomi, East Jakarta Head Sub-dept. of Water Management, admitted the project is implemented in front of Pacuan Kuda Pulomas.

“Channel to be dredged and plastered is about 1.6 kilometer,” he said, Wednesday (4/20).

30 PPSU Personnel Cleaned Pulomas Debris

According to him, plastering project is divided into two sides, west and east. Each side to be plastered is 800 meters with two meters of height above water surface and 50 cm into the channel bottom.

The project has been started since a month ago and it is targeted to complete this April.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1219 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1056 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye910 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye736 personFolmer
  5. TMII Prepares Stuntman Show to Music Concert

    access_time23-12-2024 remove_red_eye694 personNurito