You don't have javascript enabled. Good luck with that.
Pencarian
2.610 LED Smart System Sudah Terpasang di Jaksel
.
photo Aldi Geri Lumban Tobing - Beritajakarta.id

2,610 PJU in S. Jakarta Uses Smart System LED

Since April 25 to May 11, 2016, South Jakarta Sub-dept. of Industry and Energy has installed 2,610 smart system LED 40 watt at 10 sub-districts. It is targeted to instal 21,944 lamps by the end of this year.

90 watt is for settlement road, 120 watt for connecting road, and 200 watt for protocol road

Ichsan Tasik, Head Section of Monitoring and Handling for the agency, admitted that those lights are designed for settlement road. His side also target to instal 28,056 Smart System LED 90 watt, 120 watt and 200 watt.

“90 watt is for settlement road, 120 watt for connecting road, and 200 watt for protocol road. But the distributor’s stock only prepare 40 watt for now,” he said, Thursday (5/12).

Tens of Malfunctioned Street Lights in E. Jakarta Repaired

According to the data, the installation has been done for Cilandak sub-district by 268 units, Jagalarsa 260 units, Kebayoran Baru 267 units, Kebayoran Lama 270 units, Setiabudi 244 units, Mampang Prapatan 267 units, Pancoran 248 units, Pasar Minggu 263 units, Pesanggrahan 263 units, and Tebet 260 units.

Linked News
Popular News indeks
  1. Earth Day in Jakarta Reduces 297 Tons of Carbon Emissions

    access_time27-04-2025 remove_red_eye385 personBudhi Firmansyah Surapati
  2. Pramono Wants to Strengthen Betawi Culture

    access_time26-04-2025 remove_red_eye351 personDessy Suciati
  3. Pramono Ensures to Pursue Vehicle Tax Arrears in Jakarta

    access_time30-04-2025 remove_red_eye344 personDessy Suciati
  4. Earth Day, Pramono Encourages Citizens to Switch Off Lights Simultaneously

    access_time26-04-2025 remove_red_eye324 personDessy Suciati
  5. CCTV Installation at 100 Residential Areas to Complete Next Week

    access_time25-04-2025 remove_red_eye300 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

780
Hari
17
Jam
21
Menit
38
Detik