You don't have javascript enabled. Good luck with that.
Pencarian
Turap Kali Angke

Residents Demand Angke River Sheet Pile Construction Project to Be Finished

The unfinished construction project of Angke River sheet pile has made the residents who live in RW 01, 04, and 05, Kapuk Muara Urban Village, Penjaringan Sub-District, North Jakarta, worry their homes will remain be flooded during heavy rain or when the river overflows. The project is currently leaving 300 meters to be finished. It has been stalled since 2013 and there is no sign it will be continued.

In rainy season few months ago, our settlement was inundated until 1.5 meters high. What is worse, the project is stalled and has not been started again until now

“In rainy season few months ago, our settlement was inundated until 1.5 meters high. What is worse, the project is stalled and has not been started again until now,” complained Hamid Efendi (50), resident of RW 01 Kapuk Muara, Friday (4/25).

Responding that, Head of North Jakarta Water Management Public Works Sub-Department, Wagiman Silalahi, admitted that one of the causes of flooding in that region is the uninstalled sheet pile on Angke River plaster along 300 meters. The condition is worsened by the micro channel that is not working optimally due to it blocked by buildings. However, he ensured that the construction project of Angke River sheet pile will be continued this year by Jakarta Public Works Department.

Unworthy Sheet Piles in Central Jakarta to Be Repaired

“The project is scheduled to be started in upcoming July or August, and is expected to finish by the end of this year,” he stated.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1054 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye990 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye962 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye917 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye703 personAldi Geri Lumban Tobing