You don't have javascript enabled. Good luck with that.
Pencarian
Cegah Calo, Pengoperasian Terminal Pulogebang Berbasis IT

IT Installation at Pulogebang Terminal Needs 3 Months

Jakarta Dept. of Transportation is coordinating with Transportation Ministry to operate IT system at Pulogebang Terminal.

Three months is our fastest period. We only improve the existing network there

The IT installation at the terminal is predicted needs three months.

“Three months is our fastest period. We only improve the existing network there,” said Andri Yansyah, Jakarta Head Dept. of Transportation, Monday (6/6).

Pulogebang Terminal Worthiness Test Held Today

According to him, IT system is needed to prevent ticket scalper entering the terminal area. It is hoped the auto bus company will sell their tickets via online after the network is installed fully.

“The service is designed like at airport and train station,” he added.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1456 personFolmer
  2. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1232 personAldi Geri Lumban Tobing
  3. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1061 personAldi Geri Lumban Tobing
  4. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye993 personFolmer
  5. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye888 personAldi Geri Lumban Tobing