You don't have javascript enabled. Good luck with that.
Pencarian
Saluran Air di Jalan Zamrud Kemayoran di Normalisasi

Water Channel on Jalan Zamrud Kemayoran Dredged

The 55 meter water channel on Jalan Zamrud, Kemayoran, Central Jakarta is dredged by Central Jakarta Sub-dept. of Water Management. The project is targeted to finish by the end of this month.

The project has been started since Wednesday (6/8) ago

Head Section of Maintenance for the agency, Boris Karlop Lumbangaol, admitted the effort is done since the channel can not function well because of blocked by dry mud.

“The project has been started since Wednesday (6/8) ago. It is hoped to complete in the next two weeks,” he said, Sunday (6/12).

30 Manhole Covers on Jl STM Walang Dismantled

His side deploys one mini excavator to ease sediment transport into the dump truck. “Mini excavator is deployed for three days,” he added.

According to him, the channel will be widened by 80 cm and deepened by 80 cm. His side deploys 18 personnel of the agency.

“Sheet pile installation has reached 15 meter out of 55 meter,” he closed.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye970 personAldi Geri Lumban Tobing
  2. Jakarta Assesses Needs and Coordinates Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye659 personAldi Geri Lumban Tobing
  3. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye651 personAldi Geri Lumban Tobing
  4. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye632 personDessy Suciati
  5. Pramono: Independence must Be Manifested Through Concrete Action

    access_time17-08-2026 remove_red_eye626 personDessy Suciati