Crossing on Jalan Cempaka Putih Timur Normalized
access_time June 19 2016 05:06 PM remove_red_eye 1381
Reported by Rudi Hermawan | Translated by Rizky Mawardi
Reported by Rudi Hermawan | Translated by Rizky Mawardi
Central Jakarta Sub-dept. of Water Management normalized channel crossing on Jalan Cempaka Putih Timur XIII, Cempaka Putih, Central Jakarta. The effort is done since mud sediment clogged the channel.
Sediment thickness is 80 cm
Head Section of Maintenance for Central Jakarta Sub-dept. pf Water Management, Boris Karlop Lumbangaol, admitted the normalization is also to respond citizens report on Qlue.
“Sediment thickness is 80 cm,” he said, Sunday (6/19).
Channel on Jl Kamal Muara Raya DredgedThe project is started since Saturday (6/18) and predicted to finish by Wednesday (6/22). There are 12 taskforces personnel deployed.
“Channel will be widened by one meter and deepened by 80 cm. 250 sediment sacks have been transported from the location,” he closed.