You don't have javascript enabled. Good luck with that.
Pencarian
Arus Mudik Dimukai, Pemasangan Lampu PJU di Kalimalang Dikebut
.
photo Nurito - Beritajakarta.id

LED Lamp Installation Along Jl Kalimalang Accelerated

Approaching homecoming season, the street light installation keeps being accelerated along Jl Kalimalang, East Jakarta. 

It is targeted to be complete today by installing 56 lamps. Considering homecoming flow will begin this week

Jakarta Industry and Energy Dept Head, Yuli Hartono disclosed street light type light emitting diode (LED) on Jl Kalimalang is targeted to reach 56 units. Those are installed from junction of Jl Raden Inten until Caman which borders with Bekasi.

"It is targeted to be complete today by installing 56 lamps. Considering homecoming flow will begin this week," he stated, when being met at Jl Kalimalang, Monday (6/27).

2,610 LED Lamps Installed in South Jakarta

She explains, each lamp has 90 watts power. They also have been equipped with time switch technology that will turn off automatically at noon.

At the same place, Head of East Jakarta Industry and Energy Sub-dept, Nurhidayat added has coordinated with PT Wika as a contractor of Bekasi Cawang Kampung Melayu Flyover. They were asked to install spotlight along Jl Kalimalang for optimizing the lighting.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye950 personTP Moan Simanjuntak
  2. Second Pilkada 2024 Debate Theme Set, Don't Miss It

    access_time26-10-2024 remove_red_eye777 personAldi Geri Lumban Tobing
  3. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye643 personBudhi Firmansyah Surapati
  4. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  5. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye392 personTiyo Surya Sakti