You don't have javascript enabled. Good luck with that.
Pencarian
Arus Mudik Dimukai, Pemasangan Lampu PJU di Kalimalang Dikebut
.
photo Nurito - Beritajakarta.id

LED Lamp Installation Along Jl Kalimalang Accelerated

Approaching homecoming season, the street light installation keeps being accelerated along Jl Kalimalang, East Jakarta. 

It is targeted to be complete today by installing 56 lamps. Considering homecoming flow will begin this week

Jakarta Industry and Energy Dept Head, Yuli Hartono disclosed street light type light emitting diode (LED) on Jl Kalimalang is targeted to reach 56 units. Those are installed from junction of Jl Raden Inten until Caman which borders with Bekasi.

"It is targeted to be complete today by installing 56 lamps. Considering homecoming flow will begin this week," he stated, when being met at Jl Kalimalang, Monday (6/27).

2,610 LED Lamps Installed in South Jakarta

She explains, each lamp has 90 watts power. They also have been equipped with time switch technology that will turn off automatically at noon.

At the same place, Head of East Jakarta Industry and Energy Sub-dept, Nurhidayat added has coordinated with PT Wika as a contractor of Bekasi Cawang Kampung Melayu Flyover. They were asked to install spotlight along Jl Kalimalang for optimizing the lighting.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1039 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye904 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye547 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye447 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye381 personAldi Geri Lumban Tobing