You don't have javascript enabled. Good luck with that.
Pencarian
Arus Mudik Dimukai, Pemasangan Lampu PJU di Kalimalang Dikebut

LED Lamp Installation Along Jl Kalimalang Accelerated

Approaching homecoming season, the street light installation keeps being accelerated along Jl Kalimalang, East Jakarta. 

It is targeted to be complete today by installing 56 lamps. Considering homecoming flow will begin this week

Jakarta Industry and Energy Dept Head, Yuli Hartono disclosed street light type light emitting diode (LED) on Jl Kalimalang is targeted to reach 56 units. Those are installed from junction of Jl Raden Inten until Caman which borders with Bekasi.

"It is targeted to be complete today by installing 56 lamps. Considering homecoming flow will begin this week," he stated, when being met at Jl Kalimalang, Monday (6/27).

2,610 LED Lamps Installed in South Jakarta

She explains, each lamp has 90 watts power. They also have been equipped with time switch technology that will turn off automatically at noon.

At the same place, Head of East Jakarta Industry and Energy Sub-dept, Nurhidayat added has coordinated with PT Wika as a contractor of Bekasi Cawang Kampung Melayu Flyover. They were asked to install spotlight along Jl Kalimalang for optimizing the lighting.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye974 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye934 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye836 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye710 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye608 personAnita Karyati