You don't have javascript enabled. Good luck with that.
Pencarian
 12 PPSU Cilangkap Bersihkan Saluran Phb Kali Tengah
.
photo Nurito - Beritajakarta.id

Connecting Channel of Kali Tengah Cilangkap Dredged

Tens of PPSU personnel of Cilangkap Urban Village dredged connecting channel of Kali Tengah. The effort is done based on report and complaint from local residents.

Today we deploy 12 PPSU personnel cleaning the channel from mud and trash

Cilangkap Urban Village Head, Dwi Ispuranto said, the cleaning project is focused at Jalan Masjid Al Khoir and Jalan Wira Kencana IV-V. Based on citizens report, settlement at RT 01, 03, and 08 and RT 06 RW 02 Cilangkap is usually flooded if the channel is overflowing.

“Today we deploy 12 PPSU personnel cleaning the channel from mud and trash,” he said, Saturday (7/23).

51 Connecting Channels in C. Jakarta Dredged

According to him, the channel already faces shallowing. It must be dredged totally. It means East Jakarta Sub-dept. of Water Management role is needed.

Chairman of RT 03/02 Cilangkap, Suparto, admitted the flood could reach 50-69 cm

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1524 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye943 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye473 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye432 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye412 personFolmer