You don't have javascript enabled. Good luck with that.
Pencarian
 12 PPSU Cilangkap Bersihkan Saluran Phb Kali Tengah
.
photo Nurito - Beritajakarta.id

Connecting Channel of Kali Tengah Cilangkap Dredged

Tens of PPSU personnel of Cilangkap Urban Village dredged connecting channel of Kali Tengah. The effort is done based on report and complaint from local residents.

Today we deploy 12 PPSU personnel cleaning the channel from mud and trash

Cilangkap Urban Village Head, Dwi Ispuranto said, the cleaning project is focused at Jalan Masjid Al Khoir and Jalan Wira Kencana IV-V. Based on citizens report, settlement at RT 01, 03, and 08 and RT 06 RW 02 Cilangkap is usually flooded if the channel is overflowing.

“Today we deploy 12 PPSU personnel cleaning the channel from mud and trash,” he said, Saturday (7/23).

51 Connecting Channels in C. Jakarta Dredged

According to him, the channel already faces shallowing. It must be dredged totally. It means East Jakarta Sub-dept. of Water Management role is needed.

Chairman of RT 03/02 Cilangkap, Suparto, admitted the flood could reach 50-69 cm

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1146 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye845 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye825 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye775 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye754 personAldi Geri Lumban Tobing