You don't have javascript enabled. Good luck with that.
Pencarian
       Sudin PE Kebut Pemasangan 2.000 Lampu LED SS di Jalan Protokol
.
photo Aldi Geri Lumban Tobing - Beritajakarta.id

LED Lamp Installation in South Jakarta Still Constrained

Lamp installation won't reach 5,000 units because we have to install them using a ladder car, while it is limited

Street light type LED installation in South Jakarta is constrained by inadequate number of ladder cars. It makes the installation target of 5,000 points in 2016, was forced to be removed.

"Lamp installation won't reach 5,000 units because we have to install them using a ladder car, while it is limited. There are still two weeks. I think we could install at least 2,000 units. Before Independence Day celebration, it could already be installed in middle of city, strategic lane," said Ichsan Tasik, Section Head of Supervision and Control for South Jakarta Industry and Energy Sub-dept, Monday (8/1).

2,610 LED Lamps Installed in South Jakarta

According to him, until Saturday (7/30), there are 560 points replaced with LED smart system lamp.

"Lamp installation has reached Jl HR Rasuna Said and Jl Sultan Agung. Maybe it will finish two days ahead. After that, we will do the same thing in Mampang until Duren Tiga-Ragunan," he finished.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye359 personTiyo Surya Sakti
  2. Rano Inspects Location and Delivers Aid to Fire Victims in Bukit Duri

    access_time20-07-2025 remove_red_eye344 personNurito
  3. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye329 personAldi Geri Lumban Tobing
  4. Council Urges Free School Programs to Prioritize Principles of Fairness and Quality

    access_time18-07-2025 remove_red_eye321 personFakhrizal Fakhri
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye320 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik