You don't have javascript enabled. Good luck with that.
Pencarian
1.400 Meter Kubik Lumpur di Saluran PHB Pondok Gading Utama Dikeruk
.
photo Aldi Geri Lumban Tobing - Beritajakarta.id

Pondok Gading Connecting Channel Dredged

Mud in the Pondok Gading Utama's connecting channel, Jl Pegangsaan Indah Barat II, Kelapa Gading, North Jakarta, cleaned.

1,400 cubic of mid have been picked up

Division Head of Water Management for Kelapa Gading Sub-district, Rukmana disclosed, mud dredging in the channel is carried out over citizen’s request. This is because, during rainy season, inundation as high as 50-60 cm often hit the citizen residential.

Mud in Channel of Jl Sunter Kemayoran Dredged

He explains the officer has dredged about 800 meters of total long is 1,000 meters. The channel itself is dredged up to two meters deep.

"1,400 cubic of mid have been picked up," he stated, Tuesday (8/9).

He added, mud dredging has been ongoing since July 28, 2016 and is targeted to be complete on August 15, 2016. To optimize it, one unit of excavator and two units of trucks have been sent to the field.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1036 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye902 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye544 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye446 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing