You don't have javascript enabled. Good luck with that.
Pencarian
 Pemkab Kepulauan Seribu Bangun IPAL di Pulau Panggang

IPAL will Be Built on Panggang Island Soon

Seribu Islands Regency Administration is about to spend Rp 3.27 billion taken from 2016 APBD to build a waste water processing system (IPAL) on Panggang Island. 

IPAL project on Panggang Island will take 120 days ahea

Head of Seribu Islands Water Management Sub-dept, Mustajab disclosed, IPAL project on Panggang Island has been set its winning bidder.

"IPAL project on Panggang Island will take 120 days ahead," he told, Wednesday (8/9).

17 Waste Channels in Seribu Island Integrated to IPAL

He disclosed that the project is required to maintain the beach from waste. After IPAL, the whole waste, either black water or green water will be connected to the IPAL

"Thus there will no longer waste polluting the beach in Seribu Islands," he finished.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5399 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4551 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1751 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye987 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye911 personAldi Geri Lumban Tobing