You don't have javascript enabled. Good luck with that.
Pencarian
Penertiban Rawajati, Rekayasa Lalin Diberlakukan di Jalan Sekitar
.
photo Suparni - Beritajakarta.id

Rawajati Controlling, Traffic Engineering Applied

South Jakarta Sub-dept. of Transportation applies traffic engineering related with buildings demolition along rail bank, RT 09/04, Rawajati Urban Village, Pancoran.

Traffic engineering is applied since 5 AM

“Traffic engineering is applied since 5 AM. The effort is aimed to smooth the controlling,” said Christianto, head of agency, Thursday (9/1).

According to him, the engineering is also aimed to prevent road users watching the controlling. This will cause traffic jam surely.

500 Satpol PP Personnel Deployed in Rawajati

“We deploy 45 personnel and assisted with city police personnel,” he added.

The engineering is applied from Jalan TMP Kalibata, Pancoran or heading to Jalan Dewi Sartika, Cawang. All vehicle are diverted to Kalibata flyover.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1148 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye846 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye826 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye778 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye755 personAldi Geri Lumban Tobing