You don't have javascript enabled. Good luck with that.
Pencarian
Lumpur Saluran PHB Kelapa Puan Dikeruk

Kelapa Puan Connecting Channel Dredged

The connecting channel of Kelapa Puan, Kelap Gading Timur, Kelapa Gading, North Jakarta was dredged. The dredging was applied along 900 meters by deploying one heavy equipment.

The channel was never been dredged before

Kelapa Gading Sub-district Head Section of Water Management, Rukmana, said sedimentation has caused shallowing. During heavy rain, the water inundated the road.

“The channel was never been dredged before,” she said, Wednesday (8/31).

Sawi Connecting Channel Needs Sheet Pile

According to her, the channel is ended to Betik River which is also being dredged. The channel will be dredged up to four meter deep.

“We deploy one excavator and two trucks to transport the dredging material,” she closed.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1330 personBudhi Firmansyah Surapati
  2. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye692 personBudhi Firmansyah Surapati
  3. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye613 personAldi Geri Lumban Tobing
  4. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye536 personAldi Geri Lumban Tobing
  5. Jakarta Provincial Government Anticipates the Impact of Volcanic Ash from Mount Anak Krakatau

    access_time06-09-2026 remove_red_eye529 personFolmer