Nias Connecting Channel Plaster Improved
access_time September 27 2016 04:35 PM remove_red_eye 1367
Reported by Aldi Geri Lumban Tobing | Translated by Rizky Mawardi
Reported by Aldi Geri Lumban Tobing | Translated by Rizky Mawardi
Kelapa Gading Sub-district Section of Water Management improves the plaster of Nias connecting channel at Jalan Kelapa Nias Raya, Pegangsaan Dua Urban Village.
We demolish the eroded plaster to provide new plaster
At this moment, the material to improve the plaster has been distributed to the site.
Head Section of Kelapa Gading Sub-district Water Management, Rukmana, said the improvement has been started since Sunday (9/24). It is targeted to complete one month from now. Worker to improve the plaster along 200 meters.
Sulaiman Connecting Channel Dredged“We demolish the eroded plaster to provide new plaster,” she said, Monday (9/25).
As for information, Nias connecting channel plaster was eroded since three months ago due to mud dredging. Moreover, the area is often passed by heavy vehicles.