You don't have javascript enabled. Good luck with that.
Pencarian
Penertiban Bukit Duri Dijadwalkan Selesai Hari Ini

Bukit Duri Building Control Completed Today

The building control along Ciliwung Riverbank, Bukit Duri Urban Village, Tebet, South Jakarta is targeted to complete today. It is because Ciliwung river normalization can not be postponed.

The controlling must complete today

“The controlling must complete today,” said Tri Kurniadi, South Jakarta Mayor, Wednesday (9/28).

He added that buildings remain left at RW 10 are buildings with certificate by 11 units.

No Compensation for Bukit Duri Citizens

“The rests buildings are demolished fully. If they are able to lease house here, they should be able to pay flat unit lease too,” he added.

Meanwhile, City Police Chief, Mochamad Iriawan, admitted the demolition process run smoothly.

“The controlling run smoothly. It is hoped will bring goodness for Jakarta citizens too,” he stated.

Based on the data, 66 buildings are demolished today. Those are five at RW 10, 14 at RW 11, 33 at RW 12, and 14 buildings at RW 12 but outside the map.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye2010 personAldi Geri Lumban Tobing
  2. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye932 personAldi Geri Lumban Tobing
  3. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye828 personFakhrizal Fakhri
  4. Cipete Selatan Steps Up Waste Management at the Source

    access_time12-06-2026 remove_red_eye737 personTiyo Surya Sakti
  5. Malaka Sari Fire Survivors Receive Assistance

    access_time12-06-2026 remove_red_eye568 personNurito