You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran PHB Jalan Krendang Utara Dinormalisasi

Connecting Channel Jalan Krendang Utara Normalized

The connecting channel Jalan Krendang Utara at RW 03, Krendang Urban Village, Tambora Sub-district, West Jakarta is normalized. It is predicted the normalization to complete in the end of November.

Mud and trash have disturbed the water flow

West Jakarta Head Sub-dept. of Water Management, Imron Syahrin, said the channel width is two meters and length by 500 meters. The channel is full with mud and trash.

“Mud and trash have disturbed the water flow,” he said, Tuesday (11/1).

Dirty Drains in Krendang Cleaned

He added that the water of the channel will overflow if the channel is not dredged. His side deployed 15 freelancers to dredge the channel.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye828 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye750 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye602 personAldi Geri Lumban Tobing
  4. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye549 personDessy Suciati
  5. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye541 personAnita Karyati