You don't have javascript enabled. Good luck with that.
Pencarian
DKI akan Percepat Pembebasan Lahan untuk MRT

City to Speed Up Land Buying Process for MRT

Jakarta Provincial Government is about to speed up the land buying process for Mass Rapid Transit (MRT) project. Strict action will be applied since the project is for public facility.

Construction remains running. Citizens should not disturb the public urgency

“Construction remains running. Citizens should not disturb the public urgency. I’ll check the real condition later,” said Acting Jakarta Governor, Sumarsono, Tuesday (11/15).

He added that the land owners should cooperative for this case. The land will be used as public transportation. If the construction is disturbed, citizens will wait longer to get this transportation.

Traffic Engineering Applied for Jalan Pasar Jumat

“There are five lands to be bought. I want the buying process remains run as usual,” he added.

As planned before, he will visit the MRT site project this noon, especially for delayed land buying process.

“I need to visit the site for looking the solution. I also have role for this project, together with MRT Director,” he closed.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye927 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye629 personAldi Geri Lumban Tobing
  3. Governor Approves Removal of Seven Unauthorized Houses on Dispora Land

    access_time13-11-2026 remove_red_eye600 personFakhrizal Fakhri
  4. Pramono Outlines Measures to Address Five Issues in Kramat Jati

    access_time13-11-2026 remove_red_eye589 personFakhrizal Fakhri
  5. Jakarta Esports 2026 Draws Enthusiastic Crowds at M Bloc Space

    access_time13-11-2026 remove_red_eye548 personTiyo Surya Sakti