You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Sheet Pile Saluran PHB Karang Kendal Rampung
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

Sheet Pile of Karang Kendal Connecting Channel Repaired

The reparation of sheet pile that installed at Karang Kendal Connecting Channel, Jl Karang Kendal, Rorotan Urban Village, Cilincing, North Jakarta, finally completed. Now, the sheet pile has been installed on both sides.

On both sides of the channel is totally 800 meters. We deliberately install sheet pile to avoid the damage

Head of North Jakarta Water Management Sub-dept, Herning Wahyuningsih disclosed, sheet pile construction is including both sides of the channel as long as 400 meters. It is hoped, its installation would maximize its function.

Cilincing Channel's Sheet Pile Reparation Constrained

"On both sides of the channel is totally 800 meters. We deliberately install sheet pile to avoid the damage," she expressed, Thursday (12/1).

She explains, it will smoothen dredging process. Thus the channel deep can be maximized without damaging the sheet pile structure.

"Our project has been carried out since August and is targeted to be finished by the end of this month," she finished.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1148 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye846 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye826 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye778 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye755 personAldi Geri Lumban Tobing