You don't have javascript enabled. Good luck with that.
Pencarian
PT Transjakarta Setop Sementara Operasional 30 Bus

Operational of 30 Articulated Buses Stopped Temporarily

PT Transportasi Jakarta (Transjakarta) has stopped operational of 30 articulated buses brand Ankai temporarily. By doing so, Transjakarta can conduct investigation towards the bus deeply.

We never tolerate any intereference that related with the safety aspect. All buses that we operate must be safe

Director of PT Transjakarta, Budi Kaliwono asserted, articulated bus operational is stopped to guarantee the safety of the bus passenger, following fire incident that burned the TJ054 bus at MT Haryono, Jakarta, Thursday (12/1) afternoon.

"We never tolerate any intereference that related with the safety aspect. All buses that we operate must be safe," he stated, Thursday (12/1).  

Transjakarta Operates Normally on Dec. 2

He ensured Transjakarta bus operational will remain normal, despite operational of 30 articulated buses are stopped. There will be 1,300 buses operate to serve the public.

As for the information, the fire that burned the TJ054 bus at Jl MT Haryono did not cause casualties.

Then Transjakarta immediately coordinated with Jakarta Fire Handling and Rescue Dept to put out the flames. The firemen managed to control it within 20 minutes. And now, the case has been entrusted to the police for investigation.

"Temporary allegation, fire came from front of cabin, due to electricity short-circuit," he told.

His side committed that aspects of the passenger safety and bus maintenance already meet the standard.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1705 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1478 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1334 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1118 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye814 personDessy Suciati