You don't have javascript enabled. Good luck with that.
Pencarian
 Padat Lumpur Saluran Penghubung Jl Ori Dinormalisasi
.
photo TP Moan Simanjuntak - Beritajakarta.id

Connecting Channel on Jalan Ori Normalized

Connecting channel on Jalan Ori, Kota Bambu Selatan Urban Village, Palmerah, West Jakarta was normalized. Sediment has decreased the channel volume.

It’s been long time no dredging for the channel. If heavy rain falls, the water will overflow and inundate the road

Palmerah Sub-district Head, Zeri Ronazy, admitted the channel condition was poor. Some spots of the channel can not flow the water due to dry sediment.

“It’s been long time no dredging for the channel. If heavy rain falls, the water will overflow and inundate the road,” he said, Wednesday (12/21).

Al-Kamal Connecting Channel Cleaned

According to him, the channel was dredged by West Jakarta Sub-dept. of Water Management personnel.

“Personnel also demolish the manhole to ease the dredging,” he closed.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1148 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye846 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye826 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye778 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye755 personAldi Geri Lumban Tobing