You don't have javascript enabled. Good luck with that.
Pencarian
 Padat Lumpur Saluran Penghubung Jl Ori Dinormalisasi
.
photo TP Moan Simanjuntak - Beritajakarta.id

Connecting Channel on Jalan Ori Normalized

Connecting channel on Jalan Ori, Kota Bambu Selatan Urban Village, Palmerah, West Jakarta was normalized. Sediment has decreased the channel volume.

It’s been long time no dredging for the channel. If heavy rain falls, the water will overflow and inundate the road

Palmerah Sub-district Head, Zeri Ronazy, admitted the channel condition was poor. Some spots of the channel can not flow the water due to dry sediment.

“It’s been long time no dredging for the channel. If heavy rain falls, the water will overflow and inundate the road,” he said, Wednesday (12/21).

Al-Kamal Connecting Channel Cleaned

According to him, the channel was dredged by West Jakarta Sub-dept. of Water Management personnel.

“Personnel also demolish the manhole to ease the dredging,” he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye866 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye422 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye369 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye354 personDessy Suciati
  5. Pramono: Jakarta Government Acts Swiftly to Tackle Flooding

    access_time30-01-2026 remove_red_eye346 personDessy Suciati
close