Connecting Channel on Jalan Ori Normalized

Wednesday, December 21st 2016 Reporter: TP Moan Simanjuntak Translator: Rizky Mawardi 1625

 Padat Lumpur Saluran Penghubung Jl Ori Dinormalisasi

(Foto: TP Moan Simanjuntak)

Connecting channel on Jalan Ori, Kota Bambu Selatan Urban Village, Palmerah, West Jakarta was normalized. Sediment has decreased the channel volume.

It’s been long time no dredging for the channel. If heavy rain falls, the water will overflow and inundate the road

Palmerah Sub-district Head, Zeri Ronazy, admitted the channel condition was poor. Some spots of the channel can not flow the water due to dry sediment.

“It’s been long time no dredging for the channel. If heavy rain falls, the water will overflow and inundate the road,” he said, Wednesday (12/21).

According to him, the channel was dredged by West Jakarta Sub-dept. of Water Management personnel.

“Personnel also demolish the manhole to ease the dredging,” he closed.

Bagikan ke :
BANG JAKI +indeks
POTRET JAKARTA +indeks
VIDEO +indeks

Hitung Mundur 22 Juni 2027

697
Hari
10
Jam
20
Menit
49
Detik