You don't have javascript enabled. Good luck with that.
Pencarian
Kawasan KBT Dipasangi 350 Lampu LED SS

350 LED Lights Installed in KBT

Hundreds of Light Emitting Diode (LED) lights will installed in East Flood Canal (KBT) East Jakarta. Of total 350 lights, 220 of them have been installed. It is targeted on Wednesday (12/28) the installation will complete.

The installation is targeted to complete tonight

East Jakarta Head Sub-dept. of Industry and Energy, Nurhidayat, admitted the installation is started from KBT area at bridge in Cipinang Besar Selatan, Jatinegara. At this moment, the installation still reaches Pondok Bambu.

“The installation is targeted to complete tonight,” he said, Wednesday (12/28).

125 LED Lamps Installed Around Pulogebang Terminal

According to him, the lights are installed in northern side of KBT. The lights are focused on the river and road. Lights for river are 60 lights by 90 watts power each, and for roads is 120 watts.

Distance between light pole is 30-40 meters and the height is 12 meters.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close