You don't have javascript enabled. Good luck with that.
Pencarian
Kawasan KBT Dipasangi 350 Lampu LED SS
.
photo Nurito - Beritajakarta.id

350 LED Lights Installed in KBT

Hundreds of Light Emitting Diode (LED) lights will installed in East Flood Canal (KBT) East Jakarta. Of total 350 lights, 220 of them have been installed. It is targeted on Wednesday (12/28) the installation will complete.

The installation is targeted to complete tonight

East Jakarta Head Sub-dept. of Industry and Energy, Nurhidayat, admitted the installation is started from KBT area at bridge in Cipinang Besar Selatan, Jatinegara. At this moment, the installation still reaches Pondok Bambu.

“The installation is targeted to complete tonight,” he said, Wednesday (12/28).

125 LED Lamps Installed Around Pulogebang Terminal

According to him, the lights are installed in northern side of KBT. The lights are focused on the river and road. Lights for river are 60 lights by 90 watts power each, and for roads is 120 watts.

Distance between light pole is 30-40 meters and the height is 12 meters.

Linked News
Popular News indeks
  1. Rano Inspects Location and Delivers Aid to Fire Victims in Bukit Duri

    access_time20-07-2025 remove_red_eye669 personNurito
  2. Assistance Continues to Be Provided to Bukit Duri Fire Victims

    access_time20-07-2025 remove_red_eye454 personNurito
  3. Rano Ensures Swift Action in Bukit Duri Fire Handling

    access_time19-07-2025 remove_red_eye396 personFakhrizal Fakhri
  4. C. Jakarta TP PKK Grows 2,470 Chili and Tomato Seedlings

    access_time18-07-2025 remove_red_eye389 personFolmer
  5. Munjirin Leads Simultaneous Planting at RPTRA Rawa Jaya

    access_time18-07-2025 remove_red_eye385 personNurito

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik