You don't have javascript enabled. Good luck with that.
Pencarian
Turap Saluran H Sanyar Butuh Perbaikan
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

Sheet Pile of Drain on Jl H Sanyar Needs Repair

Citizens living in RW 06, Penggilingan Urban Village, Cakung, East Jakarta are requesting the related unit to repair a damaged sheet pile on Jl H Sanyar. 

This is because the soil is often landslides and cover the drain, precisely at the part that doesn't have sheet pile

The complaint was conveyed by Head of Penggilingan Urban Village, Usdiati to Head of East Jakarta Water Resources Sub-dept., Yazied Bustomi, on the sidelines of Activity of Cleanliness Sunday Morning (AKMP) in his region. 

Usdiati disclosed, she has repeatedly got public complaint about development and reparation of sheet pile in the drain as long as 200 meters. Because of damaged sheet pile, the drain cannot accommodate and flow water optimally towards Pinus Elok River.

Locals Request Sheet Pile Installation at Long Storage Lodan

"This is because the soil is often landslides and cover the drain, precisely at the part that doesn't have sheet pile," she stated, Sunday (1/15).

She explained, drain on Jl H Sanyar, accommodating water from some drains in RW 06 before flowing into Pinus Elok River. Hence, its function should be optimized which aims to minimize inundation.

On the other hand, Head of East Jakarta Water Resources Sub-dept., Yazied Bustomi revealed to immediately follow up citizen request. As planned, sheet pile development would use river stone and concrete materials.

"We'll discuss it soon. This is our priority this year," he disclosed.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye415 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye399 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye355 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye326 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye318 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik