You don't have javascript enabled. Good luck with that.
Pencarian
Ini Lokasi Terdampak Luapan Kali Ciliwung di Jakarta
.
photo Reza Hapiz - Beritajakarta.id

Ciliwung River Overflowing and Flooding 30 RWs

Additional flood from Katulampa Dam, Bogor, West Java, made Ciliwung River surrounding areas got flooded.

Water start to flood in residents since 6 A.M. In East Jakarta there are 2,393 families (KK) or 7,789 people got affected

Referring to City Regional Disaster Handling (BPBD) data, there were 18 RWs in six urban villages flooded.

"Water started to flood in residents since 6 AM. In East Jakarta there are 2,393 families (KK) or 7,789 people got affected," said Husein Murad, Head of City BPBD, Thursday (2/16).

Sheet Pile Leaked, Floods Swamp Jatinegara Area

He specified that in Cibubur, water overflowing to three RWs and reached about 30-100 centimeters tall. While in Cawang, five RWs got flooded about 50-100 centimeters tall.  

"In Kampung Melayu there are 5 RWs got flooded 30-100 centimeters. While in Bidara Cina, 3 RWs flooded by 20-80 centimeters," he added.

He continued in South Jakarta there were 12 RWs in five urban villages got flooded. Detailed, 6 RWs in Pejaten Timur reached 30-150 centimeters and 1 RW in Kebon Baru reached 20-40 centimeters.

While 1 RW in Pengadengan reached 20-70 centimeters, 3 RWs in Bukit Duri reached 20-40 centimeters.

"In South Jakarta, there are 293 Families got affected," he continued.

He further said that in East Jakarta and South Jakarta, overflowing water from Ciliwung river made 30 RWs, 11 urban villages, and six sub-districts flooded.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye395 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye352 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye316 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik