You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Kali Perbaikan Pompa dan Turap Jadi Prioritas Sudin SDA Jakut Minimalisir Genangan

Here Are Three Priority Programs of North Jakarta to Overcome Flood

Three programs are prioritized in North Jakarta to overcome flooding. Those are river normalization and repair of pump and sheet pile.

In this year we have three programs. They are dredging mud in rivers, connecting channels or drains, as well as repairing pumps and sheet piles

North Jakarta Water Resources Sub-dept. Head, Herning Wahyuningsih said the mud dredging and sheet pile in six sub-districts have been done since January 2017 by deploying 20 excavators.

Drain in Petamburan Urban Village Dredged

"In this year we have three programs. They are dredging mud in rivers, connecting channels or drains, as well as repairing pumps and sheet piles," she said on Monday (2/20).

He added, dredging is done with a depth of about 1.5 to 3 meters, depending on water flow from upstream to downstream.

Then for river normalization, has been ongoing in Ancol River, Tanjungan, Ring Road, Banglio, Cilincing Raya, Petukangan, Swasembada's connecting channel (PHB), Mawar, and Sunter Kresek.

Aside that, her sub-dept. also has repaired water pumps in 14 pump houses. Right now, all pumps are in ready-to-be-operated condition to overcome flooding.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye702 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye524 personAldi Geri Lumban Tobing
  3. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye521 personAldi Geri Lumban Tobing
  4. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye501 personAnita Karyati
  5. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye495 personFakhrizal Fakhri