You don't have javascript enabled. Good luck with that.
Pencarian
Revitalisasi Terminal Pulogadung Tunggu Kajian

Pulogadung Terminal Renovation Waiting for Assessment

After redirecting Inter-city and Inter-province (AKAP) bus to Integrated Pulogebang Terminal, now Pulogadung Terminal will be renovated after assessment process is done.

It needs a transit oriented development assessment first before renovation

Jakarta Transportation Dept.'s Road Transportation Terminal Management Unit Head, Mohammad Faisol, said his side already proposed the assessment of terminal.

"Right now Pulogadung Terminal area is just for inner city public transportation. Besides, half of the land will be utilized as a shelter for raided vehicles," he said on Thursday (3/9).

Land on South Side of Pulogadung Terminal Used as Vehicle Shelter

He explained that around 80 employees that working in AKAP terminal all this time are redirected to help securing the vehicle which have been stopped operation.

According to him, residential facilities will be built at Pulogadung Terminal, and then park and ride facility.

"It needs a transit oriented development assessment first before renovation. Now we already proposed it and its acceptable processing is done around 3 months," he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye393 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close