You don't have javascript enabled. Good luck with that.
Pencarian
Revitalisasi Terminal Pulogadung Tunggu Kajian

Pulogadung Terminal Renovation Waiting for Assessment

After redirecting Inter-city and Inter-province (AKAP) bus to Integrated Pulogebang Terminal, now Pulogadung Terminal will be renovated after assessment process is done.

It needs a transit oriented development assessment first before renovation

Jakarta Transportation Dept.'s Road Transportation Terminal Management Unit Head, Mohammad Faisol, said his side already proposed the assessment of terminal.

"Right now Pulogadung Terminal area is just for inner city public transportation. Besides, half of the land will be utilized as a shelter for raided vehicles," he said on Thursday (3/9).

Land on South Side of Pulogadung Terminal Used as Vehicle Shelter

He explained that around 80 employees that working in AKAP terminal all this time are redirected to help securing the vehicle which have been stopped operation.

According to him, residential facilities will be built at Pulogadung Terminal, and then park and ride facility.

"It needs a transit oriented development assessment first before renovation. Now we already proposed it and its acceptable processing is done around 3 months," he closed.

Linked News
Popular News indeks
  1. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2375 personTiyo Surya Sakti
  2. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye1000 personAldi Geri Lumban Tobing
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye985 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye851 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye744 personBudhi Firmansyah Surapati