You don't have javascript enabled. Good luck with that.
Pencarian
Revitalisasi Terminal Pulogadung Tunggu Kajian
.
photo istimewa - Beritajakarta.id

Pulogadung Terminal Renovation Waiting for Assessment

After redirecting Inter-city and Inter-province (AKAP) bus to Integrated Pulogebang Terminal, now Pulogadung Terminal will be renovated after assessment process is done.

It needs a transit oriented development assessment first before renovation

Jakarta Transportation Dept.'s Road Transportation Terminal Management Unit Head, Mohammad Faisol, said his side already proposed the assessment of terminal.

"Right now Pulogadung Terminal area is just for inner city public transportation. Besides, half of the land will be utilized as a shelter for raided vehicles," he said on Thursday (3/9).

Land on South Side of Pulogadung Terminal Used as Vehicle Shelter

He explained that around 80 employees that working in AKAP terminal all this time are redirected to help securing the vehicle which have been stopped operation.

According to him, residential facilities will be built at Pulogadung Terminal, and then park and ride facility.

"It needs a transit oriented development assessment first before renovation. Now we already proposed it and its acceptable processing is done around 3 months," he closed.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1555 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye971 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye507 personBudhi Firmansyah Surapati
  4. Long Holidays will Be More Exciting with Rawa Belong Bandeng Festival

    access_time25-01-2025 remove_red_eye479 personAldi Geri Lumban Tobing
  5. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye470 personDessy Suciati