You don't have javascript enabled. Good luck with that.
Pencarian
Sekda : Sodetan Kali Ciliwung Solusi Atasi Banjir Jakarta

Ciliwung Sodetan Construction Has Touched 54.7 Percent

This is a must, water from Ciliwung can be flowed into KBT

The construction of Ciliwung crossing channel (sodetan) that functions to flow water from Ciliwung River towards East Flood Canal (KBT) has reached 54.7 percent or 600 meters out of 1.27 kilometers.

City Secretary, Saefullah asserted the construction is very urgent to overcome flood problem.

Crossing to Be Provided at Rawa Babon Reservoir

"This is a must, water from Ciliwung can be flowed into KBT," he stated, Monday (4/3).

According to him, the KBT capacity is very adequate to flow water towards the upstream or the sea.

"Hopefully, the sodetan construction and Ciliwung normalization can be recontinued soon," he stated.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye290 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye286 personAldi Geri Lumban Tobing