You don't have javascript enabled. Good luck with that.
Pencarian
Sekda : Sodetan Kali Ciliwung Solusi Atasi Banjir Jakarta

Ciliwung Sodetan Construction Has Touched 54.7 Percent

This is a must, water from Ciliwung can be flowed into KBT

The construction of Ciliwung crossing channel (sodetan) that functions to flow water from Ciliwung River towards East Flood Canal (KBT) has reached 54.7 percent or 600 meters out of 1.27 kilometers.

City Secretary, Saefullah asserted the construction is very urgent to overcome flood problem.

Crossing to Be Provided at Rawa Babon Reservoir

"This is a must, water from Ciliwung can be flowed into KBT," he stated, Monday (4/3).

According to him, the KBT capacity is very adequate to flow water towards the upstream or the sea.

"Hopefully, the sodetan construction and Ciliwung normalization can be recontinued soon," he stated.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1652 personBudhi Firmansyah Surapati
  2. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1504 personDessy Suciati
  3. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye835 personBudhi Firmansyah Surapati
  4. Jakarta Provincial Government Anticipates the Impact of Volcanic Ash from Mount Anak Krakatau

    access_time06-09-2026 remove_red_eye689 personFolmer
  5. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye655 personFakhrizal Fakhri