You don't have javascript enabled. Good luck with that.
Pencarian
 Genset Baru di Pulau Sebira Diuji Coba

New Generator in Sebira Island Tested

A new generator powered 125 KVA will be tested for 24 hours in Sebira Island, North Seribu Islands today, Saturday (4/8).

We directly supply electricity to the local residents, which aims to quantify how much fuel and power capacity needed

"We directly supply electricity to the local residents, which aims to quantify how much fuel and power capacity needed," expressed Melinda Sagala, Head of Seribu Islands Industry and Energy Sub-dept., Saturday (4/8).

Sebira Island Citizen Requests Regency Government to Manage RO Immediately

According to Melinda, it is the back-up generator to optimize electricity services for Sebira Island residents. Previously there was only one generator in the island. 

"It will operate over 20 hours per day, 4 hours for the old generator. Right now, locals can enjoy it all day. Previously they felt it at night only," he finished. 

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye824 personAldi Geri Lumban Tobing
  2. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye574 personDessy Suciati
  3. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye567 personAldi Geri Lumban Tobing
  4. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye564 personAldi Geri Lumban Tobing
  5. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye547 personFakhrizal Fakhri