Re-Auction of 100 RPTRAs Construction Targeted to Finish Before Eid
Reported by Aldi Geri Lumban Tobing | Translated by Maria Inggita
Re-auction process of 100 Children-Friendly Integrated Public Spaces (RPTRA)s construction is targeted to be finished before Eid.
In this fasting month, we will finish auction process
Jakarta Secretary's Environment and Development Assistant, Gamal Sinurat said, these 100 RPTRA will be built using City Budget 2017.
"In this fasting month, we will finish auction process. But, BPPBJ Head (Blessmiyanda-red) is optimistic that auction winner could be determined until Eid," he said, Monday (5/22).
Djarot Wants RPTRA Project to Finish On TimeAccording to him, this auction is failed because the budget is too low for high specification of RPTRA facilities. Those facilities are children playground, CCTV, and LED.
"Too sophisticated thus expensive. After they investigate further, it is impossible in profit," he explained.
He added that Jakarta Public Housing and Residential Area will analyze to lower the specification without reducing the quality and still meet the standard.
"Previously, we planned to set LED from City Hall. But it will be set at RPTRA location to cut the cost," he closed.