You don't have javascript enabled. Good luck with that.
Pencarian
DED Tanggul Muara Angke Diusulkan di APBD-Perubahan

Design Studies for Muara Angke Embankment Project Proposed in APBD-P

Jakarta Transportation Dept. is going to propose the study of the Detailed Engineering Design (DED) for development of tidal wave embankments in Muara Angke, Pluit, Penjaringan, North Jakarta in 2017 Amendment City Budget (APBD-P).

Hopefully, after the project is finished, inundation problem in Muara Angke will be resolved

Jakarta Transportation Dept. Vice Head, Sigit Wijatmoko said his dept. could get the DED for the embankment project, after the proposal is approved in this year's APBD-P.

Djarot Wants APBD-P 2017 and RAPDB 2018 Discussed At The Same Time

"Therefore we want to propose the DED first in APBD-P," he stated, Wednesday (5/31).

He needs to know first about the topography and span of the required sheet pile. After the proposal is approved in APBD-P, it will be continued with embankment project in 2018.

"Hopefully, after the project is finished, inundation problem in Muara Angke will be resolved," he said.

Linked News
Popular News indeks
  1. Jakarta Council Begins Deliberations on New Population and Housing Bylaws

    access_time21-08-2026 remove_red_eye1832 personFakhrizal Fakhri
  2. Pramono: Independence must Be Manifested Through Concrete Action

    access_time17-08-2026 remove_red_eye686 personDessy Suciati
  3. Pramono Commends Madurese Community for Their Vital Role in Building Jakarta

    access_time19-08-2026 remove_red_eye661 personDessy Suciati
  4. Pramono Vows to Prioritize Jakarta’s Strategic Development

    access_time22-08-2026 remove_red_eye615 personDessy Suciati
  5. Jakarta Agrees on Rp79.59T Revised 2026 Budget Framework

    access_time21-08-2026 remove_red_eye399 personFakhrizal Fakhri