You don't have javascript enabled. Good luck with that.
Pencarian
DED Tanggul Muara Angke Diusulkan di APBD-Perubahan
.
photo istimewa - Beritajakarta.id

Design Studies for Muara Angke Embankment Project Proposed in APBD-P

Jakarta Transportation Dept. is going to propose the study of the Detailed Engineering Design (DED) for development of tidal wave embankments in Muara Angke, Pluit, Penjaringan, North Jakarta in 2017 Amendment City Budget (APBD-P).

Hopefully, after the project is finished, inundation problem in Muara Angke will be resolved

Jakarta Transportation Dept. Vice Head, Sigit Wijatmoko said his dept. could get the DED for the embankment project, after the proposal is approved in this year's APBD-P.

Djarot Wants APBD-P 2017 and RAPDB 2018 Discussed At The Same Time

"Therefore we want to propose the DED first in APBD-P," he stated, Wednesday (5/31).

He needs to know first about the topography and span of the required sheet pile. After the proposal is approved in APBD-P, it will be continued with embankment project in 2018.

"Hopefully, after the project is finished, inundation problem in Muara Angke will be resolved," he said.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1506 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye929 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye427 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye410 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye398 personFolmer