You don't have javascript enabled. Good luck with that.
Pencarian
DED Tanggul Muara Angke Diusulkan di APBD-Perubahan

Design Studies for Muara Angke Embankment Project Proposed in APBD-P

Jakarta Transportation Dept. is going to propose the study of the Detailed Engineering Design (DED) for development of tidal wave embankments in Muara Angke, Pluit, Penjaringan, North Jakarta in 2017 Amendment City Budget (APBD-P).

Hopefully, after the project is finished, inundation problem in Muara Angke will be resolved

Jakarta Transportation Dept. Vice Head, Sigit Wijatmoko said his dept. could get the DED for the embankment project, after the proposal is approved in this year's APBD-P.

Djarot Wants APBD-P 2017 and RAPDB 2018 Discussed At The Same Time

"Therefore we want to propose the DED first in APBD-P," he stated, Wednesday (5/31).

He needs to know first about the topography and span of the required sheet pile. After the proposal is approved in APBD-P, it will be continued with embankment project in 2018.

"Hopefully, after the project is finished, inundation problem in Muara Angke will be resolved," he said.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye972 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye934 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye829 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye710 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye607 personAnita Karyati