You don't have javascript enabled. Good luck with that.
Pencarian
DED Tanggul Muara Angke Diusulkan di APBD-Perubahan

Design Studies for Muara Angke Embankment Project Proposed in APBD-P

Jakarta Transportation Dept. is going to propose the study of the Detailed Engineering Design (DED) for development of tidal wave embankments in Muara Angke, Pluit, Penjaringan, North Jakarta in 2017 Amendment City Budget (APBD-P).

Hopefully, after the project is finished, inundation problem in Muara Angke will be resolved

Jakarta Transportation Dept. Vice Head, Sigit Wijatmoko said his dept. could get the DED for the embankment project, after the proposal is approved in this year's APBD-P.

Djarot Wants APBD-P 2017 and RAPDB 2018 Discussed At The Same Time

"Therefore we want to propose the DED first in APBD-P," he stated, Wednesday (5/31).

He needs to know first about the topography and span of the required sheet pile. After the proposal is approved in APBD-P, it will be continued with embankment project in 2018.

"Hopefully, after the project is finished, inundation problem in Muara Angke will be resolved," he said.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1653 personBudhi Firmansyah Surapati
  2. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1508 personDessy Suciati
  3. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye837 personBudhi Firmansyah Surapati
  4. Jakarta Provincial Government Anticipates the Impact of Volcanic Ash from Mount Anak Krakatau

    access_time06-09-2026 remove_red_eye692 personFolmer
  5. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye655 personFakhrizal Fakhri