You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Waduk Hutan Kota Srengseng Sudah 75 Persen
.
photo Rudi Hermawan - Beritajakarta.id

Srengseng Urban Forest Reservoir Has Been Dredged Up to 75 Percent

Reservoir is dredged up to two meters depth. Predictably will be complete in early August

Reservoir dredging in Srengseng Urban Forest, Jalan Haji Kelik, Srengseng Urban Village, Kembangan, West Jakarta has reached 75 percent. After it is done, it is hoped could minimize inundation in Kelapa Dua and Srengseng urban villages when it rains.

West Jakarta Water Resources Sub-dept. Head, Imron said, reservoir in the location already experiencing silting.

Aselih Embung Dredging Process Reached 30 Percent

"Thus the water channel from the settlements in both urban villages can't flow directly, so overflowing to the settlements," he expressed, Tuesday (7/18).

To speed up dredging, he has sent three amphibian excavators and one long-arm excavator to the field. In addition, 12 officers are also alerted for the transport of dredging results. 

"Reservoir is dredged up to two meters depth. Predictably will be complete in early August," he hoped.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye395 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye350 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye323 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye315 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik