You don't have javascript enabled. Good luck with that.
Pencarian
 Rekayasa Lalu Lintas di Simpang Kuningan diberlalukan Senin
.
photo Wuri Setyaningsih - Beritajakarta.id

Traffic Engineering in Kuningan Crossroads Start to be Applied

Traffic engineering in Kuningan crossroads, South Jakarta, Monday (7/24). This is conducted to unravel traffic congestion due to Mampang-Kuningan Underpass construction work.

We will deploy our officers every day to direct the drivers

Polda Metro Jaya Dirlantas, Kombes Pol. Halim Panggara said, traffic engineering will be conducted until November 30 referring to construction completion target.

"Vehicles from Mampang to Setiabudi will be diverted to slow lane. While Transjakarta bus will be one lane with regular vehicles. Bus stop is located outside of project fence," he said when monitoring Kuningan crossroads, Monday (7/24).

Traffic Engineering Trial at Matraman Intersection Applied

Meanwhile, for vehicles from Kuningan to Mampang or Buncit will be directed to enter slow lane in front of Netherlands Embassy Transjakarta shelter at Kuningan Timur. Then for vehicles from Semanggi must turn right at Kuningan Timur crossroads to go to Mampang or Buncit.

"Road users from Semanggi to Pancoran should also pay attention to vehicles from Kuningan," he added.

He informed for vehicles from Pancoran to Setiabudi can turn right at Kuningan Timur crossroads. For Transjakarta bus from Semanggi to Grogol must pay attention to vehicles from Mampang.

"Every road users who want to turn back must be conducted in relocated place. We will deploy our officers every day to direct the drivers," he closed.

Linked News
Popular News indeks
  1. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  2. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye783 personFolmer
  3. Jakarta Aeromodelling Team Grabs First Gold Medal

    access_time16-09-2024 remove_red_eye556 personAldi Geri Lumban Tobing
  4. Area Arrangement on Jalan Kramat to Complete this Weekend

    access_time17-09-2024 remove_red_eye430 personTiyo Surya Sakti
  5. Area Arrangement on Jalan Setapak Reaches 95 Percent

    access_time14-09-2024 remove_red_eye365 personTiyo Surya Sakti