You don't have javascript enabled. Good luck with that.
Pencarian
Sudin PE Jaksel Tambah Daya Listrik di PBB Setu Babakan

Additional Electrical Power Prepared to Optimize Lebaran Betawi

We pay PLN for the additional power

South Jakarta Industry and Energy Sub-dept. is preparing additional electrical power up to 197,000 watts for the upcoming Lebaran Betawi in Setu Babakan Betawi Cultural Village (PBB), Jagakarsa.

"We pay PLN for the additional electrical power," expressed Suryanto, Head of South Jakarta Industry and Energy Sub-dept., Thursday (7/27).  

Personnel Alerted to Parse Traffic Jam During Lebaran Betawi

He stated additional power is related to the high demand for electrical, especially for the stage and 200 booths in the event. "The installation is provided by Bamus Betawi and power is from PLN," he told.

Despite the electrical is from PLN, he continued, there will be eight officers alerted to secure the power. They will be divided into two shifts per day.

Linked News
Popular News indeks
  1. Volcanic Ash Reaches Jakarta, Health Agency Calls for Protective Measures

    access_time06-09-2026 remove_red_eye1498 personBudhi Firmansyah Surapati
  2. Jakartans Urged to Stay Calm and Take Precautions Amid Mt. Anak Krakatau Volcanic Ash

    access_time06-09-2026 remove_red_eye751 personBudhi Firmansyah Surapati
  3. Jakarta Provincial Government Anticipates the Impact of Volcanic Ash from Mount Anak Krakatau

    access_time06-09-2026 remove_red_eye627 personFolmer
  4. Jakarta BPBD Urges Residents to Prepare for Meteorological Drought

    access_time04-09-2026 remove_red_eye557 personAldi Geri Lumban Tobing
  5. Pramono Emphasizes Importance of Creative Spaces for Children

    access_time03-09-2026 remove_red_eye479 personDessy Suciati