You don't have javascript enabled. Good luck with that.
Pencarian
Sudin PE Jaksel Tambah Daya Listrik di PBB Setu Babakan

Additional Electrical Power Prepared to Optimize Lebaran Betawi

We pay PLN for the additional power

South Jakarta Industry and Energy Sub-dept. is preparing additional electrical power up to 197,000 watts for the upcoming Lebaran Betawi in Setu Babakan Betawi Cultural Village (PBB), Jagakarsa.

"We pay PLN for the additional electrical power," expressed Suryanto, Head of South Jakarta Industry and Energy Sub-dept., Thursday (7/27).  

Personnel Alerted to Parse Traffic Jam During Lebaran Betawi

He stated additional power is related to the high demand for electrical, especially for the stage and 200 booths in the event. "The installation is provided by Bamus Betawi and power is from PLN," he told.

Despite the electrical is from PLN, he continued, there will be eight officers alerted to secure the power. They will be divided into two shifts per day.

Linked News
Popular News indeks
  1. 21 Parking Spots to Make Your Jakarta 499th Anniversary Experience Seamless

    access_time26-06-2026 remove_red_eye938 personAldi Geri Lumban Tobing
  2. Over 11 Kilometers of Overhead Utility Cables Removed in West Jakarta

    access_time26-06-2026 remove_red_eye896 personBudhi Firmansyah Surapati
  3. Celebrating Jakarta`s 499th Anniversary at HI, Please Use Public Transportation

    access_time26-06-2026 remove_red_eye755 personAldi Geri Lumban Tobing
  4. 190 Satpol PP Personnel Deployed to Secure Jakarta Anniversary Celebration

    access_time26-06-2026 remove_red_eye719 personFolmer
  5. Night at The Library Marks Jakarta's 499th Anniversary with Five-Century Message

    access_time27-06-2026 remove_red_eye703 personAnita Karyati