You don't have javascript enabled. Good luck with that.
Pencarian
Sudin PE Jaksel Tambah Daya Listrik di PBB Setu Babakan

Additional Electrical Power Prepared to Optimize Lebaran Betawi

We pay PLN for the additional power

South Jakarta Industry and Energy Sub-dept. is preparing additional electrical power up to 197,000 watts for the upcoming Lebaran Betawi in Setu Babakan Betawi Cultural Village (PBB), Jagakarsa.

"We pay PLN for the additional electrical power," expressed Suryanto, Head of South Jakarta Industry and Energy Sub-dept., Thursday (7/27).  

Personnel Alerted to Parse Traffic Jam During Lebaran Betawi

He stated additional power is related to the high demand for electrical, especially for the stage and 200 booths in the event. "The installation is provided by Bamus Betawi and power is from PLN," he told.

Despite the electrical is from PLN, he continued, there will be eight officers alerted to secure the power. They will be divided into two shifts per day.

Linked News
Popular News indeks
  1. Indonesia-Singapore Match: 80 Dishub Personnel Deployed to Manage Traffic Around GBK

    access_time25-09-2026 remove_red_eye1143 personAldi Geri Lumban Tobing
  2. Pramono: Climate Action Must Deliver Tangible Benefits to Residents

    access_time25-09-2026 remove_red_eye553 personDessy Suciati
  3. Pasar Baru Rowing Race Set to Take Place This Sunday

    access_time25-09-2026 remove_red_eye522 personFolmer
  4. Kelapa Gading-Manggarai LRT Serves 100,343 Passengers

    access_time26-09-2026 remove_red_eye497 personAldi Geri Lumban Tobing
  5. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye475 personAldi Geri Lumban Tobing