You don't have javascript enabled. Good luck with that.
Pencarian
Sudin PE Jaksel Tambah Daya Listrik di PBB Setu Babakan

Additional Electrical Power Prepared to Optimize Lebaran Betawi

We pay PLN for the additional power

South Jakarta Industry and Energy Sub-dept. is preparing additional electrical power up to 197,000 watts for the upcoming Lebaran Betawi in Setu Babakan Betawi Cultural Village (PBB), Jagakarsa.

"We pay PLN for the additional electrical power," expressed Suryanto, Head of South Jakarta Industry and Energy Sub-dept., Thursday (7/27).  

Personnel Alerted to Parse Traffic Jam During Lebaran Betawi

He stated additional power is related to the high demand for electrical, especially for the stage and 200 booths in the event. "The installation is provided by Bamus Betawi and power is from PLN," he told.

Despite the electrical is from PLN, he continued, there will be eight officers alerted to secure the power. They will be divided into two shifts per day.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye955 personAldi Geri Lumban Tobing
  2. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye617 personAldi Geri Lumban Tobing
  3. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye607 personDessy Suciati
  4. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye577 personDessy Suciati
  5. Transportation Agency Prepares Traffic Management Plan for Indonesia's 81st Anniversary Celebrations

    access_time15-08-2026 remove_red_eye572 personAldi Geri Lumban Tobing