You don't have javascript enabled. Good luck with that.
Pencarian
Sudin PE Jaksel Tambah Daya Listrik di PBB Setu Babakan

Additional Electrical Power Prepared to Optimize Lebaran Betawi

We pay PLN for the additional power

South Jakarta Industry and Energy Sub-dept. is preparing additional electrical power up to 197,000 watts for the upcoming Lebaran Betawi in Setu Babakan Betawi Cultural Village (PBB), Jagakarsa.

"We pay PLN for the additional electrical power," expressed Suryanto, Head of South Jakarta Industry and Energy Sub-dept., Thursday (7/27).  

Personnel Alerted to Parse Traffic Jam During Lebaran Betawi

He stated additional power is related to the high demand for electrical, especially for the stage and 200 booths in the event. "The installation is provided by Bamus Betawi and power is from PLN," he told.

Despite the electrical is from PLN, he continued, there will be eight officers alerted to secure the power. They will be divided into two shifts per day.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye568 personFolmer
  2. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye378 personBudhi Firmansyah Surapati
  3. South Jakarta Strengthens Efforts to Boost Regional Tax Revenue

    access_time15-06-2026 remove_red_eye369 personTiyo Surya Sakti
  4. Education Agency: Student Admissions to be Objective, Transparent, and Inclusive

    access_time15-06-2026 remove_red_eye365 personAldi Geri Lumban Tobing
  5. 54 Vehicles Undergo Free Emissions Testing at Mitra Praja Sunter

    access_time15-06-2026 remove_red_eye355 personAnita Karyati