You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran Penghubung Malakasari Mencapai 450 Meter

Normalization on Jl. I Gusti Ngurah Rai PHB Channel Accelerated

PHB channel normalization on the north side of Jl. I Gusti Ngurah Rai, Malakasari, Duren Sawit, East Jakarta is keep accelerated.

We target to finish normalization in December. Now, 450 meters of it has been done

Recently, it has been normalized for 450 meters from total length 700 meters.

"Our target is to finish normalization in December. Now, 450 meters of it has been done," said Mustajab, Head of East Jakarta Water Resources (SDA) Sub-dept., Monday (9/11).    

Cipulir PPSU Personnel Cleaned Sekretaris River PHB

He explained, PHB channel normalization is started since March with retaining wall repairing, gabion wall installment, and trash and mud dredging.

"Its width is 3-4 meters. We are adding its depth 3.5 meters from before," he closed.

Linked News
Popular News indeks
  1. Jakarta Removes Gibran’s Portraits Across All Government Offices

    access_time16-11-2026 remove_red_eye1187 personFakhrizal Fakhri
  2. Transjakarta Offers Free Rides for Jakarta Vertical Run 2026 Participants

    access_time14-11-2026 remove_red_eye732 personAldi Geri Lumban Tobing
  3. Pejagalan Steps Up Flood Defenses with Pump and Drainage Upgrades

    access_time14-11-2026 remove_red_eye547 personAnita Karyati
  4. Welcoming BTS's Concert in December 2026, Jakarta is Dressed in Purple

    access_time16-11-2026 remove_red_eye482 personFakhrizal Fakhri
  5. 32 School Basketball Teams to Compete in Teladan Cup 2026

    access_time15-11-2026 remove_red_eye400 personBudhi Firmansyah Surapati