You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Jalan Lingkungan di Jakut Capai 90 Persen
.
photo istimewa - Beritajakarta.id

Neighborhood Roads Repair in North Jakarta Reached 90 Percent

A number of neighborhood roads in six sub-districts in North Jakarta have entered repair stage. The repair itself uses hotmix and concretization method.

The road repair is proposal from the aspirations of the people and follow-up program of the Bina Marge Sub-dept.

According to Ujang Royani, Section Head of Road and Bridge for North Jakarta Bina Marga Sub-dept., the repair has reached about 85-90 percent.

Access Road Towards Dock in Panggang Island Needs Repair

"Repair method is varied. Among them are hotmix with a thickness of about 3 centimeters and concretization with a thickness of about 12 centimeters," he expressed, Wednesday (10/18).

He details, those roads repaired are located in Tanjung Priok Sub-district with a total area of 29,000 square meters by spending Rp 18.2 billion, Penjaringan Sub-district with 10,300 square meters wide spending Rp 6.6 billion.

Further, there are also in Pademangan Sub-district with 10,580 square meters wide spending Rp 6.8 billion, Cilincing Sub-district with 34,800 square meters wide spending Rp 16.05 billion, Kelapa Gading Sub-district with 11,200 square meters wide spending Rp 5.3 billion, and Koja Sub-district with 25,100 square meters wide spending Rp 11.5 billion.

"The road repair is proposal from the aspirations of the people and follow-up program of the Bina Marge Sub-dept.," he closed.

Linked News
Popular News indeks
  1. Rano Inspects Location and Delivers Aid to Fire Victims in Bukit Duri

    access_time20-07-2025 remove_red_eye668 personNurito
  2. Assistance Continues to Be Provided to Bukit Duri Fire Victims

    access_time20-07-2025 remove_red_eye454 personNurito
  3. Rano Ensures Swift Action in Bukit Duri Fire Handling

    access_time19-07-2025 remove_red_eye396 personFakhrizal Fakhri
  4. C. Jakarta TP PKK Grows 2,470 Chili and Tomato Seedlings

    access_time18-07-2025 remove_red_eye389 personFolmer
  5. Munjirin Leads Simultaneous Planting at RPTRA Rawa Jaya

    access_time18-07-2025 remove_red_eye385 personNurito

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik