You don't have javascript enabled. Good luck with that.
Pencarian
30 Petugas Perbaiki Tanggul Jebol di Jati Padang

30 Personnel Repair Collapsed Embankment in Jati Padang

30 joint personnel from South Jakarta Water Resources (SDA) Dept. and PPSU were deployed to repair collapsed Kali Pulo sack embankment, at RW 06, Jati Padang.

Temporarily, we will strengthen it with sack filled with soil first

South Jakarta SDA Dept. Head, Holi Susanto said, collapsed sack embankment has six meters long. Its repair is estimated will be finished tomorrow.

"Temporarily, we will strengthen it with sack filled with soil first, because we need to handle it fast," he expressed, Friday (10/20).

City to Fix Flood Handling Report System

Meanwhile, Jati Padang Urban Village Head, Noviant Wijanarko said collapsed embankment is located at Sabili Alley, RT 03/06. Settlement location is lower than embankment thus inundated.

"There are 100 families and 70 buildings were impacted. Currently, inundation has been receded along with reduced water level in river," he informed.

Previously, overflowing water caused settlement inundated with around 80-100 centimeters high. Residents were evacuated to Al-Ridwan Mosque near the settlement. But currently, residents have returned to their own houses.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1446 personFolmer
  2. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye974 personFolmer
  3. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye880 personAldi Geri Lumban Tobing
  4. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye783 personAldi Geri Lumban Tobing
  5. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye690 personAldi Geri Lumban Tobing