You don't have javascript enabled. Good luck with that.
Pencarian
30 Petugas Perbaiki Tanggul Jebol di Jati Padang

30 Personnel Repair Collapsed Embankment in Jati Padang

30 joint personnel from South Jakarta Water Resources (SDA) Dept. and PPSU were deployed to repair collapsed Kali Pulo sack embankment, at RW 06, Jati Padang.

Temporarily, we will strengthen it with sack filled with soil first

South Jakarta SDA Dept. Head, Holi Susanto said, collapsed sack embankment has six meters long. Its repair is estimated will be finished tomorrow.

"Temporarily, we will strengthen it with sack filled with soil first, because we need to handle it fast," he expressed, Friday (10/20).

City to Fix Flood Handling Report System

Meanwhile, Jati Padang Urban Village Head, Noviant Wijanarko said collapsed embankment is located at Sabili Alley, RT 03/06. Settlement location is lower than embankment thus inundated.

"There are 100 families and 70 buildings were impacted. Currently, inundation has been receded along with reduced water level in river," he informed.

Previously, overflowing water caused settlement inundated with around 80-100 centimeters high. Residents were evacuated to Al-Ridwan Mosque near the settlement. But currently, residents have returned to their own houses.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye290 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye286 personAldi Geri Lumban Tobing